Jump to content

Dynamic Load Balancing EVC2: Difference between revisions

From Teltonika Energy Wiki
No edit summary
 
Line 26: Line 26:


=== Phase balance during lack of power ===
=== Phase balance during lack of power ===
When the smart meter detects that there is less than 6A for each phase, the charging station will switch from 3phase mode to 1phase mode until 6ampers are available for all phases.
When the smart meter detects that there is less than 6A for each phase, the charging station will switch from 3phase mode to 1phase mode until 6 amperes are available for all phases.


[[File:PhaseSwitch.png|frameless|600x600px]]
[[File:PhaseSwitch.png|frameless|600x600px]]
Line 36: Line 36:


=== RS485 communication ===
=== RS485 communication ===
For RS485 communication it is recommended to use a twister pair communication cable. Check example below.
For RS485 communication it is recommended to use a twisted pair communication cable. Check example below.


[[File:TeltoCharge_DLB_CableExample.png|frameless]]
[[File:TeltoCharge_DLB_CableExample.png|frameless]]

Latest revision as of 09:33, 20 October 2026