Dynamic Load Balancing EVC2: Difference between revisions
Appearance
No edit summary |
|||
| Line 26: | Line 26: | ||
=== Phase balance during lack of power === | === Phase balance during lack of power === | ||
When the smart meter detects that there is less than 6A for each phase, the charging station will switch from 3phase mode to 1phase mode until | When the smart meter detects that there is less than 6A for each phase, the charging station will switch from 3phase mode to 1phase mode until 6 amperes are available for all phases. | ||
[[File:PhaseSwitch.png|frameless|600x600px]] | [[File:PhaseSwitch.png|frameless|600x600px]] | ||
| Line 36: | Line 36: | ||
=== RS485 communication === | === RS485 communication === | ||
For RS485 communication it is recommended to use a | For RS485 communication it is recommended to use a twisted pair communication cable. Check example below. | ||
[[File:TeltoCharge_DLB_CableExample.png|frameless]] | [[File:TeltoCharge_DLB_CableExample.png|frameless]] | ||