== PHASE BALANCE EXPLANATION ==
== PHASE BALANCE EXPLANATION ==
TeltoCharge has advanced functionality to detect a car's charging type and, if required, switch phases during mid-charge.
TeltoCharge has advanced functionality to detect a car's charging type and, if required, switch phases mid-charge.


The same phase switch process will happen if the smart meter detects, that less than 6A is available for one of the phases.
The same phase switch process will happen if the smart meter detects that less than 6A is available for one of the phases.


=== Adaptation to the car's charging capability ===
=== Adaptation to the car's charging capability ===
If the charger is set for 3phase charging, but the plugged car can only draw current from one phase, TeltoCharge will switch to one-phase mode after a short period of time
If the charger is set for 3phase charging, but the plugged car can only draw current from one phase, TeltoCharge will switch to one-phase mode after a short period of time.


[[File:CarExample.png|frameless|493x493px]]
[[File:CarExample.png|frameless|493x493px]]


=== Phase balance during lack of power ===
=== Phase balance during lack of power ===
When the smart meter detects that there is less than 6A for each phase, the charging station will switch from 3phase mode to 1phase mode until 6ampers are available for all phases
When the smart meter detects that there is less than 6A for each phase, the charging station will switch from 3phase mode to 1phase mode until 6ampers are available for all phases.


[[File:PhaseSwitch.png|frameless|600x600px]]
[[File:PhaseSwitch.png|frameless|600x600px]]


== MODBUS RTU METERS ==
== MODBUS RTU METERS ==
To access energy measurement through Modbus RTU, connect both charger and the meter together using RS485 terminal for meter.
To access energy measurement through Modbus RTU, connect both the charger and the meter together using RS485 terminal for meter.


[[File:DLB meter.png|frameless|808x808px]]
[[File:DLB meter.png|frameless|808x808px]]
Line 46: Line 46:
In order to make '''Dynamic load balancing''' and '''Solar''' functionality work, please always check:
In order to make '''Dynamic load balancing''' and '''Solar''' functionality work, please always check:


* if the '''wiring''' your Smart energy meter to EVC2 is right.
* if the '''wiring''' from your Smart energy meter to EVC2 is right.
* if the '''installer menu configuration''' in mobile application according to your smart energy meter is right.
* if the '''installer menu configuration''' in mobile application according to your smart energy meter is right.


Line 84: Line 84:
| style="padding: 2px;" |[[Chint models]]
| style="padding: 2px;" |[[Chint models]]
| style="padding: 2px;" |[[Chint settings]]
| style="padding: 2px;" |[[Chint settings]]
| style="padding: 2px;" |[https://wiki.teltonika-energy.com/images/3/3b/Inepro_pro380.png METER -> TELTOCHARGE]  
| style="padding: 2px;" |[https://wiki.teltonika-energy.com/images/7/7e/Chint_meter_%281%29.png METER -> TELTOCHARGE]  
|-
|-
| style="padding: 2px;" |Entes  
| style="padding: 2px;" |Entes  
Line 112: Line 112:


== MODBUS TCP/IP METERS ==
== MODBUS TCP/IP METERS ==
To access energy measurement through Modbus TCP/IP, connect both the meter and your charger to your network. Charger has two options: either WiFi or ethernet cable.  
To access energy measurement through Modbus TCP/IP, connect both the meter and your charger to your network. Charger has two options: either Wi-Fi or Ethernet cable.  


=== Connecting Shelly 3PRO ===
=== Connecting Shelly 3PRO ===
Download the '''Shelly smart control''' app and setup the device to connect to your network. After its configured, find the IP address given to the meter.
Download the '''Shelly smart control''' app and setup the device to connect to your network. After it is configured, find the IP address given to the meter.


[[File:Shelly wiki.png|frameless|935x935px]]
[[File:Shelly wiki.png|frameless|935x935px]]
Line 128: Line 128:
[[File:Wizard p1 utility meter.png|frameless|284x284px]]
[[File:Wizard p1 utility meter.png|frameless|284x284px]]


Download the '''HomeWizard''' app and follow the setup for the meter to connect to your network. After its configured, find the IP address given to the meter.
Download the '''HomeWizard''' app and follow the setup for the meter to connect to your network. After it is configured, find the IP address given to the meter.
[[File:Homewizard wiki 1.png|frameless]] [[File:Homewizard wiki 3.png|frameless|592x592px]]
[[File:Homewizard wiki 1.png|frameless]] [[File:Homewizard wiki 3.png|frameless|592x592px]]


Line 134: Line 134:


=== Load balancing using Network meter ===
=== Load balancing using Network meter ===
A given example below is for Shelly 3Pro smart meter integration, but is identical when using HomeWizard P1.
The example below is for Shelly 3Pro smart meter integration, but is identical when using HomeWizard P1.


To connect the meter to the station, go to '''load balancing''' section in the app, choose '''network meter''' and the model you're using.  
To connect the meter to the station, go to '''load balancing''' section in the app, choose '''network meter''' and the model you're using.  
Line 140: Line 140:
[[File:Shelly DLB 1.png|frameless|938x938px]]
[[File:Shelly DLB 1.png|frameless|938x938px]]


After that select '''IP address''' as was shown in the Shelly app. Set '''max grid load''' to match the value allowed by the grid. If everything is done right - the status should indicate that the network meter has successfully connected.
After that select the '''IP address''' as was shown in the Shelly app. Set '''max grid load''' to match the value allowed by the grid. If everything is done right - the status should indicate that the network meter has successfully connected.


[[File:Shelly DLB 2.png|937x937px]]
[[File:Shelly DLB 2.png|937x937px]]
Line 160: Line 160:


== CT CLAMPS ==
== CT CLAMPS ==
It is possible to measure power readings by connecting CT clamps to each phase. Insert each CT clamp to its dedicated terminal (blue wire to B, red wire to R slot of the terminal).
It is possible to measure power readings by connecting CT clamps to each phase. Insert each CT clamp to its dedicated terminal (blue wire to B, red wire to A slot of the terminal).


<u>Make sure that clamp direction is pointing towards source (away from the charger).</u>
<u>Make sure that clamp direction is pointing towards source (away from the charger).</u>
Line 166: Line 166:
[[File:CT clamps EVC2.png|frameless|529x529px]]
[[File:CT clamps EVC2.png|frameless|529x529px]]


Mandatory CT clamp specifications:
<big>'''Mandatory CT clamp specifications:'''
 
</big>
* Rated input/current - depends on your total power input, but we would recommend not to exceed 150A.
* Rated input/current - depends on your total power input, but we would recommend not to exceed 150A.
* Turn ratio - 3000:1.
* Turn ratio - 3000:1.
Line 185: Line 185:


# It can be configured to use a watchdog for communication and if no valid communication is present after a configurable time interval, the charging (if ongoing) will stop and EVSE will not perform any charging until valid communication is reestablished;
# It can be configured to use a watchdog for communication and if no valid communication is present after a configurable time interval, the charging (if ongoing) will stop and EVSE will not perform any charging until valid communication is reestablished;
# the EVSE does not use a watchdog and continuous communication is not needed. As it is possible to change the EVSE settings by using the TeltoCharge mobile application, it is recommended for the primary device to read, compare, and change settings as needed based on user preferences and real-time requirements, ensuring a seamless and secure charging experience for electric vehicle owners. Continuous monitoring and adjustment of EVSE settings enable the primary device to stay synchronized with user inputs, maintain optimal charging conditions, and promptly respond to any changes initiated through the TeltoCharge mobile application, thereby enhancing overall efficiency and user satisfaction.
# The EVSE does not use a watchdog and continuous communication is not needed. As it is possible to change the EVSE settings by using the TeltoCharge mobile application, it is recommended for the primary device to read, compare, and change settings as needed based on user preferences and real-time requirements, ensuring a seamless and secure charging experience for electric vehicle owners. Continuous monitoring and adjustment of EVSE settings enable the primary device to stay synchronized with user inputs, maintain optimal charging conditions, and promptly respond to any changes initiated through the TeltoCharge mobile application, thereby enhancing overall efficiency and user satisfaction.


=== Device preparation ===
=== Device preparation ===
TeltoCharge must be configured as a secondary device via a TeltoCharge mobile application and device must have RS485 wired connection with the primary device..
TeltoCharge must be configured as a secondary device via a TeltoCharge mobile application and must have a RS485 wired connection with the primary device..


# Open "User menu"
# Open "User menu"
Line 235: Line 235:
| -
| -
|V
|V
|Input voltage on L2
|Input voltage on L3
|-
|-
|3
|3
Line 331: Line 331:
|'''Phase connected'''
|'''Phase connected'''
|uint16
|uint16
|0-6
|0-7
| -
| -
| -
| -
Line 432: Line 432:
|R
|R
|'''Serial number 1st word'''
|'''Serial number 1st word'''
|
|uint16
|0-65535
|0-65535
|123456789
|123456789
Line 441: Line 441:
|R
|R
|'''Serial number 2nd word'''
|'''Serial number 2nd word'''
|
|uint16
|0-65535
|0-65535
|
|
Line 471: Line 471:
|6-1000
|6-1000
|30
|30
| -
| A
|Defines max power from grid
|Defines max power from grid
|-
|-
Line 480: Line 480:
|6-32
|6-32
|10
|10
| -
| A
|Defines max settable current by user
|Defines max settable current by user
|-
|-
Line 543: Line 543:
|'''Current limit cause'''
|'''Current limit cause'''
|uint16
|uint16
|0-8
|0-7
| -
| -
| -
| -
Line 620: Line 620:
|*100kWh
|*100kWh
|Total supplied active power in a lifetime (uint16_t) >> 48
|Total supplied active power in a lifetime (uint16_t) >> 48
|-
|45
|R/W
|'''Max. limit of random delay'''
|uint16
|1-1800
|600
|s
|Max. limit of the randomized delay in seconds
|}
|}