Changes

m
no edit summary
Line 17: Line 17:  
   <ul style="list-style-type: none; margin: 0; padding: 0;">
 
   <ul style="list-style-type: none; margin: 0; padding: 0;">
   −
Once the charger is properly connected to the electrical grid and interconnected with energy meter, the next step is to configure the settings using the Teltonika Energy app. Below, you will find a comprehensive list of the settings that should be adjusted to achieve DLM functionality.
+
Once the charger is properly connected to the electrical grid and interconnected with energy meter, the next step is to configure the settings using the Teltonika Energy app. Below, you will find a comprehensive list of the settings that should be adjusted to achieve solar functionality.
    
=== General meter settings ===
 
=== General meter settings ===

Navigation menu