Installation process

From Wiki
Main Page > TeltoCharge > Getting Started > Installation process

Site preparation requirements

  • Find a suitable site on a wall (The mounting surface required to be flat and stable, for example a finished, brick or concrete wall. Wall required to be suitable to withstand TeltoCharge weight with charging cable)​.
  • Make sure that the required power supply is easily accessible. (Required power supply depends on the type of charger).
  • Make sure that TeltoCharge is not installed on direct sunlight.

Installation process

Drilling

TeltoCharge Installation InstallationProcess DrillingA.pngA - Place the drilling template on the wall and mark the three fixing points.

TeltoCharge Installation InstallationProcess DrillingB.pngB - Drill holes where the fixing points are marked.

TeltoCharge Installation InstallationProcess DrillingC.pngC - Insert the wall plugs into the fixing holes.

Housing Installation

TeltoCharge Installation InstallationProcess HousingInstallation.png

1. Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).

2. Make sure the cable grommet is properly mounted on the cables (AC input cable and Ethernet cable).

Electrical wiring

518x518px

A - T/N single phase set up (can be used in 230 V grid);

B - T/N Three phase set up (can be used in 230 V / 400 V grid);

C - IT/TT three phase set up (strictly not higher than 230/240 V);

D - IT/TT single phase set up (strictly not higher than 230/240 V);

SIM card installation

TeltoCharge Installation InstallationProcess SIMCardInstallation.PNG

Insert a nano SIM card into card slot.

Closing the middle panel

TeltoCharge Installation InstallationProcess ClosingMiddlePanel.PNG

A - Place a middle panel on the housing;

B - Fix it using DIN912 M3x8 screws;

Closing the front plate;

TeltoCharge Installation InstallationProcess ClosingFrontPanel.PNG

A - Insert the upper part of the front plate to the fixing holes and fix the plate;

B - Fix it using DIN912 M3x8 screws;

C - Lock the top of the plate;

D - Lock the bottom of the plate;

E - Fix it using DIN912 M3x8 screws;