Difference between revisions of "Installation process"

From Wiki
(Replaced content with " <li>Physical installation process</li> → RCD installation <br> → SPD - surge protection device| S...")
Tag: Replaced
m (Protected "Installation process" ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite)))
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
  <li>[[Installation process|Physical installation process]]</li>
+
==Installation process==
&rarr; [[RCD - residual current device| RCD installation]] <br>
+
===Housing Installation===
&rarr; [[SPD - surge protection device| SPD installation]] <br>
+
[[File:TeltoCharge Installation InstallationProcess DrillingA.png|border|frameless]]'''A''' - Place the drilling template on the wall and mark the three fixing points.
  
[[Category: Getting started]]
+
[[File:TeltoCharge Installation InstallationProcess DrillingB.png|border|frameless]]'''B''' - Drill holes where the fixing points are marked.
 +
 
 +
[[File:TeltoCharge Installation InstallationProcess DrillingC.png|border|frameless]]'''C''' -  Insert the wall plugs into the fixing holes.
 +
 
 +
[[File:TeltoCharge Installation InstallationProcess HousingInstallation.png|border|frameless|214x214px]]
 +
 
 +
1. Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).
 +
 
 +
2.  Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).
 +
 
 +
 
 +
[[Category: Getting Started]]

Latest revision as of 00:36, 31 March 2023

Main Page > TeltoCharge > Getting Started > Installation process

Installation process

Housing Installation

TeltoCharge Installation InstallationProcess DrillingA.pngA - Place the drilling template on the wall and mark the three fixing points.

TeltoCharge Installation InstallationProcess DrillingB.pngB - Drill holes where the fixing points are marked.

TeltoCharge Installation InstallationProcess DrillingC.pngC - Insert the wall plugs into the fixing holes.

TeltoCharge Installation InstallationProcess HousingInstallation.png

1. Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).

2. Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).