Changes

no edit summary
Line 8: Line 8:  
=== DLM with Ct Clamps: ===
 
=== DLM with Ct Clamps: ===
 
This configuration is essential in the UK, where the use of CT clamps is mandatory for managing the electric load between chargers and other electronic devices. CT clamps facilitate compliance with UK regulations by enabling precise control and optimization of the overall load. Their integration into DLM systems ensures efficient energy distribution, essential for meeting the stringent energy standards and operational requirements set forth by UK energy authorities.
 
This configuration is essential in the UK, where the use of CT clamps is mandatory for managing the electric load between chargers and other electronic devices. CT clamps facilitate compliance with UK regulations by enabling precise control and optimization of the overall load. Their integration into DLM systems ensures efficient energy distribution, essential for meeting the stringent energy standards and operational requirements set forth by UK energy authorities.
[[File:MicrosoftTeams-image (23).png|border|center|frameless]]
+
[[File:Ct clamps.jpg|center|frameless|735x735px]]
 
   
== CT Connection ==
 
== CT Connection ==
 
Dynamic Load Management (DLM) is achieved through a carefully interconnected system of chargers, where communication is governed by a designated "Master" charger, dictating instructions to the remaining "Slave" chargers. These chargers can be interconnected either in a serial or parallel manner, each requiring the use of UTP twisted pair cables for communication via the A and B pins.
 
Dynamic Load Management (DLM) is achieved through a carefully interconnected system of chargers, where communication is governed by a designated "Master" charger, dictating instructions to the remaining "Slave" chargers. These chargers can be interconnected either in a serial or parallel manner, each requiring the use of UTP twisted pair cables for communication via the A and B pins.