Physical Device Installation Guide

INSTALLATION MANUAL

Press on the picture:

File:PDF.png
thumb








MAIN STEPS

A - Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).
B - Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).
C - Close middle panel by placing it on the housing (the panel must click to the housing). And fix it using M3x8 screws.
D - Close the front plate and fix it with M3x8 screws.

PEN CT WIRING


Product has integrated PEN fault protection.

In order to receive this functionality it is required to pass the PE cable through the internal current transformer. CT shall be wired in terminal marked "PEN".

Device Commissioning Guide

First Start Guide

Follow these steps to get started with TeltoCharge in a correct way:

Step Number Description Suggestions Links
1 Connect wires Wire connections can be found in installation manual. Electrical wiring for EVC16X products
2 Pair Pairing code is the last six digits of your installer code which can be found on sticker.
3 Finish set-up Choose the currency for the electricity price and the authorization method. Add NFC tags if necessary.
4 Update device to the latest FW After pairing, choose your device in the menu, and a notification may suggest updating the firmware version. How to update
5 Go to installer menu Go to Settings and choose the Installer menu. To access it, please enter your full 9-digit installer code. Full process is here
6 Configure your TeltoCharge To achieve maximum charger power, select all electrical and functional configurations. Functionality descriptions