Changes

no edit summary
Line 13: Line 13:       −
===Solar EV charging===
+
===Solar EV charging-Measuring device===
 +
'''Measuring device''': The meter should be selected. For UK chargers, it is possible to choose CT clamps.
 +
 
 +
 
 +
'''Energy meter address''': This information can be found in the meter settings accessed through the meter display. If the address cannot be located, it is recommended to consult the smart meter manual.
 +
 
 +
 
 +
'''Current update interval''': By default, it is set to 3 seconds. However, there may be cases where the user needs to increase this value. For instance, if there are significant distances between the charger and the smart meter.
 +
 
 +
 
 +
 
 +
[[File:Ct-MeasuringDevice.png|frameless|left]]
 +
[[File:Measuring Device-Meter.jpg|frameless|center]]
 +
 
 +
 
 +
 
 +
 
 +
 
 +
===== '''Solar EV charging''' =====
 
[[File:Solar_settings.png|right|frameless|271x271px]]
 
[[File:Solar_settings.png|right|frameless|271x271px]]
 
#'''ECO+ surplus minimum''' - This setting requires the minimum value of surplus solar energy to be reached in order to initiate a charging session. If the minimum value of surplus energy is not achieved, the charger will remain in "On hold" mode, awaiting additional surplus energy. <br>
 
#'''ECO+ surplus minimum''' - This setting requires the minimum value of surplus solar energy to be reached in order to initiate a charging session. If the minimum value of surplus energy is not achieved, the charger will remain in "On hold" mode, awaiting additional surplus energy. <br>