Changes

m
Protected "Installation process" ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite))
Line 1: Line 1: −
  <li>[[Installation process|Physical installation process]]</li>
+
==Installation process==
&rarr; [[RCD - residual current device| RCD installation]] <br>
+
===Housing Installation===
&rarr; [[SPD - surge protection device| SPD installation]] <br>
+
[[File:TeltoCharge Installation InstallationProcess DrillingA.png|border|frameless]]'''A''' -  Place the drilling template on the wall and mark the three fixing points.
 +
 
 +
[[File:TeltoCharge Installation InstallationProcess DrillingB.png|border|frameless]]'''B''' - Drill holes where the fixing points are marked.
 +
 
 +
[[File:TeltoCharge Installation InstallationProcess DrillingC.png|border|frameless]]'''C''' -  Insert the wall plugs into the fixing holes.
 +
 
 +
[[File:TeltoCharge Installation InstallationProcess HousingInstallation.png|border|frameless|214x214px]]
 +
 
 +
1. Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).
 +
 
 +
2.  Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).
 +
 
    
[[Category: Getting Started]]
 
[[Category: Getting Started]]