Changes

1,513 bytes removed ,  00:36, 31 March 2023
m
Protected "Installation process" ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite))
Line 1: Line 1: −
==Site preparation requirements==
  −
* Find a suitable site on a wall (The mounting surface required to be flat and stable, for example a finished, brick or concrete wall. Wall required to be suitable to withstand TeltoCharge weight with charging cable)​.
  −
* Make sure that the required power supply is easily accessible. (Required power supply depends on the type of charger).
  −
* Make sure that TeltoCharge is not installed on direct sunlight.
   
==Installation process==
 
==Installation process==
===Drilling===
+
===Housing Installation===
 
[[File:TeltoCharge Installation InstallationProcess DrillingA.png|border|frameless]]'''A''' -  Place the drilling template on the wall and mark the three fixing points.
 
[[File:TeltoCharge Installation InstallationProcess DrillingA.png|border|frameless]]'''A''' -  Place the drilling template on the wall and mark the three fixing points.
   Line 11: Line 7:  
[[File:TeltoCharge Installation InstallationProcess DrillingC.png|border|frameless]]'''C''' -  Insert the wall plugs into the fixing holes.
 
[[File:TeltoCharge Installation InstallationProcess DrillingC.png|border|frameless]]'''C''' -  Insert the wall plugs into the fixing holes.
   −
=== Housing Installation ===
+
[[File:TeltoCharge Installation InstallationProcess HousingInstallation.png|border|frameless|214x214px]]
[[File:TeltoCharge Installation InstallationProcess HousingInstallation.png|border|frameless]]
      
1. Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).
 
1. Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).
   −
2.  Make sure the cable grommet is properly mounted on the cables (AC input cable and Ethernet cable).
+
2.  Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).
===Electrical wiring===
  −
[[File:TeltoCharge Installation InstallationProcess ElectricalWiring.PNG|border|frameless|518x518px]]
     −
'''A''' - T/N single phase set up;
     −
'''B''' - T/N Three phase set up;
+
[[Category: Getting Started]]
 
  −
'''C''' -  IT/TT three phase set up;
  −
 
  −
'''D''' -  IT/TT single phase set up;
  −
 
  −
=== SIM card installation ===
  −
[[File:TeltoCharge Installation InstallationProcess SIMCardInstallation.PNG|border|frameless]]
  −
 
  −
Insert a nano SIM card into card slot.
  −
 
  −
=== Closing the middle panel ===
  −
[[File:TeltoCharge Installation InstallationProcess ClosingMiddlePanel.PNG|border|frameless|512x512px]]
  −
 
  −
'''A''' - Place a middle panel on the housing;
  −
 
  −
'''B''' - Fix it using DIN912 M3x8 screws;
  −
 
  −
=== Closing the front plate; ===
  −
[[File:TeltoCharge Installation InstallationProcess ClosingFrontPanel.PNG|border|frameless|473x473px]]
  −
 
  −
'''A''' - Insert the upper part of the front plate to the fixing holes and fix the plate;
  −
 
  −
'''B''' -  Fix it using DIN912 M3x8 screws;
  −
 
  −
'''C''' - Lock the top of the plate;
  −
 
  −
'''D''' - Lock the bottom of the plate;
  −
 
  −
'''E''' - Fix it using DIN912 M3x8 screws;
  −
 
  −
[[Category: Installation]]