Changes

no edit summary
Line 34: Line 34:  
|Charger checks which phase is least loaded and selects that phase as a charging phase. If during charging process any of other two phases load decreases and the maximum available current will be 5 ampers higher then the charging phase, TeltoCharge will change charging phase to least loaded. [[1]]
 
|Charger checks which phase is least loaded and selects that phase as a charging phase. If during charging process any of other two phases load decreases and the maximum available current will be 5 ampers higher then the charging phase, TeltoCharge will change charging phase to least loaded. [[1]]
 
|}
 
|}
  −
  −
[[Category: FAQ]]