Line 5: |
Line 5: |
| |- | | |- |
| |1. | | |1. |
− | |If Dynamic Load balancing is enabled | + | |How TeltoCharge sets maximum charging power when 3-phase charging is enabled? |
− | | | + | |TeltoCharge checks which phase is loaded most, measures how much free current is available, and sets that current. |
| |- | | |- |
| |2. | | |2. |
| |Can I use simplified charging sequence with Dynamic load balancing. | | |Can I use simplified charging sequence with Dynamic load balancing. |
− | |Yes, there is possibility to use both features together, but there are some limitations which are regulated by the standard: | + | |Yes, there is possibility to use both features together, but there are some limitations which are regulated by the standard (IEC 61851-1 / SAE J1772): |
| | | |
| # Maximum charging current is only 10 Ampers. | | # Maximum charging current is only 10 Ampers. |
Line 17: |
Line 17: |
| |3. | | |3. |
| |Can I use 3-phase smart meter for single phase charger? | | |Can I use 3-phase smart meter for single phase charger? |
− | |No, there is no possibility to use 1-phase charger with 3-phase smart meter. | + | |Yes, there is possibility to use 1-phase charger with 3-phase smart meter. Please refer to the Energy meter instruction sheet to configure it properly. It is required to select single phase meter in the TeltoCharge application settings. |
| |- | | |- |
| |4. | | |4. |
Line 24: |
Line 24: |
| |- | | |- |
| |5. | | |5. |
− | |If phase priority is enabled, can charger automatically change phase? | + | |If "''use preferred phase''" is enabled, can charger automatically change phase? |
| |Yes, If TeltoCharge detects that prioritized phase is loaded and the maximum current it can give is 7 or less ampers, charger will make a check If other phases are loaded less: | | |Yes, If TeltoCharge detects that prioritized phase is loaded and the maximum current it can give is 7 or less ampers, charger will make a check If other phases are loaded less: |
| | | |
− | * If there is other phase which is loaded less, charger will chnage charging phase. | + | * If there is other phase which is loaded less, charger will change charging phase. |
− | * If other two phases ar loaded charger will stop charging process. | + | * If other two phases are loaded as well, charger will stop charging process. |
| |- | | |- |
| |6. | | |6. |
− | |How TeltoCharge prioritizes phases when phase priority is disabled, TeltoChagre connected to three phases and three phase charging is disabled? | + | |How TeltoCharge prioritizes phases when phase priority is disabled, TeltoChagre connected to three phases and three phase charging is disabled? [[/]] |
− | |Charger checks which phase is least loaded and selects that phase as a charging phase. If during charging process any of other two phases load decreases and the maximum available current will be 5 ampers higher then the charging phase, TeltoCharge will change charging phase to least loaded. | + | |Charger checks which phase is least loaded and selects that phase as a charging phase. If during charging process any of other two phases load decreases and the maximum available current will be 5 amperes higher then the charging phase, TeltoCharge will change charging phase to the least loaded. [[1]] |
− | |-
| |
− | |7.
| |
− | |How TeltoCharge sets maximum charging power when 3-phase charging is enabled?
| |
− | |TeltoCharge checks which phase is loaded most, measures how much free current is available, and sets that current.
| |
| |} | | |} |