Category:Physical installation process

From Wiki
Revision as of 23:50, 30 March 2023 by PauliusKo (talk | contribs) (Created page with "==Installation process== ===Housing Installation=== border|frameless'''A''' - Place the drilling template...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Installation process

Housing Installation

TeltoCharge Installation InstallationProcess DrillingA.pngA - Place the drilling template on the wall and mark the three fixing points.

TeltoCharge Installation InstallationProcess DrillingB.pngB - Drill holes where the fixing points are marked.

TeltoCharge Installation InstallationProcess DrillingC.pngC - Insert the wall plugs into the fixing holes.

TeltoCharge Installation InstallationProcess HousingInstallation.png

1. Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).

2. Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).

BACK TO PHYSICAL INSTALLATION PAGE

This category currently contains no pages or media.