Changes

no edit summary
Line 5: Line 5:     
=== DLM with CT Clamps ===
 
=== DLM with CT Clamps ===
<p>This configuration enables users to efficiently manage the electric load between chargers and other electronic devices. By leveraging the capabilities of a ct clamp, precise control and optimization of the overall load can be achieved.</p><p>[[File:DLM with meter.png|frameless|824x824px|alt=]]</p><p>''[[Supported smart energy meters for Dynamic load balancing and Solar integration|--> Supported energy meters]]''</p><p></p>
+
<p>This configuration enables users to efficiently manage the electric load between chargers and other electronic devices. By leveraging the capabilities of a ct clamp, precise control and optimization of the overall load can be achieved.</p>
 +
[[File:MicrosoftTeams-image (23).png|center|thumb]]
 +
<p></p><p>''[[Supported smart energy meters for Dynamic load balancing and Solar integration|--> Supported energy meters]]''</p><p></p>
    
=== DLM without CT Clamp: ===
 
=== DLM without CT Clamp: ===