Installation process (NA)
General specifications
Teltocharge tethered with Type 1 cable
Dimensions without cable | 170x341x97 mm |
Weight without cable | 2.8 kg |
Operating temperature | -30°C - +50°C |
IP rating | IP55 |
IK rating | IK10 |
Certification | UL2594 |
In compliance with | IEC 61851-1 |
Electrical specifications
Here you can find information about electric parameters of Teltocharge product
AC INPUT SPECIFICATIONS | |||
---|---|---|---|
Maximum power | 7,6 kW | 9,6 kW | 11,5 kW |
Input AC power connection | 2 phases | ||
Maximum current | 32 A | 40 A | 48 A |
Input voltage | 2 phases: (L-L) 240 ± 10% VAC | ||
Rated frequency | 50 / 60 HZ | ||
Standby power consumption | 4 W | ||
Earth (ground) fault protection | 20 mA AC, 6 mA DC | ||
Overvoltage category | OVC II | ||
Protection against electric shock | Class I | ||
AC Output specifications | |||
AC output voltage range | 1 phase: (L-N) 240 ± 10% VAC | ||
Connection Standart | Type 1 cable | ||
Connection to the grid | NEMA 6-50 plug to the wall socket | Direct cable from house grid
(Hardwired) | |
Power Cable | |||
Maximum cable diameter | 17.5 mm | 20,75 mm | |
Maximum wire cross section | 7.5 mm2 |
Product code structure
On the product Middle plate you can find markings showing its Product name and code, Certifications, Serial number and more.
Model | Version | Power | Connector | Connectivity | Front plate color | Front plate finish |
A | B | C | D | E | F | G |
EVC | 1 - V1 | 3 - US 7,6 kW, 1/2P, 32A, 120/240V
4 - US 9,6 kW, 1/2P, 40A, 120/240V 5 - US 11.5kW, 1/2P, 48A, 120/240V |
1 - Tethered cable | 0 - Without GSM modem | P - Gray
R - Red M - Blue B - White 0 - N/A |
0 – Without front panel
1 – Tethered cable |
Required tools
List of required tools include:
A - Hammer
B - Electric drill
C - Pencil
D - Screwdriver
E - Cutting pliers
F - Allen key 2,5 mm
G - Measuring tape
H - Utility knife
I - Level
J - Drill bit D6
Included Mounting parts
Included in the box you will find:
K - Wall plugs 6x35 mm
L - Pan head self-tapping screws galvanized steel
M - DIN912 M3x8 screws
N - Cable gland
O - Rubber washer
EV Charger Main elements
Site preparation requirements
- Find a suitable site on a wall (The mounting surface required to be flat and stable, for example a finished, brick or concrete wall. Wall required to be suitable to withstand TeltoCharge weight with charging cable).
- Make sure that the required power supply is easily accessible. (Required power supply depends on the type of charger).
- Recommendation is not to install TeltoCharge on direct sunlight to avoid overheating.
Installation process
Housing Installation
A - Place the drilling template on the wall and mark the three fixing points.
B - Drill holes where the fixing points are marked.
C - Insert the wall plugs into the fixing holes.
1. Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).
2. Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).
Electrical wiring
Closing the middle panel
A - Place a middle panel on the housing and press it, till it clicks.
B - Fix it using DIN912 M3x8 screws;
Closing the front plate;
C - Lock the top of the plate;
D - Lock the bottom of the plate;
E - Fix it using DIN912 M3x8 screws;
LED indicators
Information about LED indicators can be obtained from here