Solar integration EVC16

Revision as of 13:49, 5 March 2024 by FurkaA (talk | contribs) (Created page with " __TOC__ <h2 style="color: #4a4a4a; font-size: 24px; font-weight: bold; margin-bottom: 10px;"> Physical installation </h2> <ol style="list-style-type: none; margin: 0; paddi...")

(diff) ← Older revision | Approved revision (diff) | Latest revision (diff) | Newer revision → (diff)
Main Page > TeltoCharge > Advanced Topics > Solar integration EVC16

Physical installation

    • To ensure proper solar integration functionality, it is essential to begin with the correct physical installation. This involves having a smart energy meter installed in the electric circuit that possesses the necessary communication functionality and is included in our energy meter list. The meter plays a crucial role in detecting negative current flow, indicating when energy consumption is lower than solar generation, and feeding it back into the electrical grid. For effective communication, the charger must be interconnected with the meter.
    • When the meter detects surplus energy, it relays this information to the charger. Based on the charger's internal configurations, it will determine whether to initiate the charging process or not. It is important to note that this process depends on the specific configurations set within the charger.