Site preparation requirements

Revision as of 17:44, 7 February 2023 by PauliusKo (talk | contribs) (Protected "Site preparation requirements" ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite)))

(diff) ← Older revision | Approved revision (diff) | Latest revision (diff) | Newer revision → (diff)

Site preparation requirements

  • Find a suitable site on a wall (The mounting surface required to be flat and stable, for example a finished, brick or concrete wall. Wall required to be suitable to withstand TeltoCharge weight with charging cable)​.
  • Make sure that the required power supply is easily accessible. (Required power supply depends on the type of charger).
  • Recommendation is not to install TeltoCharge on direct sunlight to avoid overheating.