Jump to content

EVC2 CT clamps

From Teltonika Energy Wiki
Revision as of 14:09, 3 November 2025 by Benas.K (talk | contribs)

(diff) ← Older revision | Approved revision (diff) | Latest revision (diff) | Newer revision → (diff)

CT clamps

Current transformer (CT) clamps allow for a fast and easy installation when the electric distribution panel is close to the EV charger install location. The CT clamps are put on the entry power lines in the distribution box and measure the total house load going through them, providing the direct info to the EV charger. The only limit is the distance from the EV charger to the electric panel, as it should not exceed more than 15 meters for best accuracy.

Installation and configuration

Set up