Difference between revisions of "Installation process"

From Wiki
(Created page with "==Installation process== ===Drilling=== border|frameless'''A''' - Place the drilling template on the wall...")
 
Line 1: Line 1:
 
==Installation process==
 
==Installation process==
 
===Drilling===
 
===Drilling===
[[File:TeltoCharge Installation InstallationProcess DrillingA.png|border|frameless]]'''A''' -  Place the drilling template on the wall and mark the three fixing points
+
[[File:TeltoCharge Installation InstallationProcess DrillingA.png|border|frameless]]'''A''' -  Place the drilling template on the wall and mark the three fixing points.
  
 
[[File:TeltoCharge Installation InstallationProcess DrillingB.png|border|frameless]]'''B''' - Drill holes where the fixing points are marked.
 
[[File:TeltoCharge Installation InstallationProcess DrillingB.png|border|frameless]]'''B''' - Drill holes where the fixing points are marked.
Line 13: Line 13:
  
 
2.  Make sure the cable grommet is properly mounted on the cables (AC input cable and Ethernet cable).
 
2.  Make sure the cable grommet is properly mounted on the cables (AC input cable and Ethernet cable).
 +
===Electrical wiring===
 +
[[File:TeltoCharge Installation InstallationProcess ElectricalWiring.PNG|border|frameless|518x518px]]
 +
 +
'''A''' - T/N single phase set up;
 +
 +
'''B''' - T/N Three phase set up;
 +
 +
'''C''' -  IT/TT three phase set up;
 +
 +
'''D''' -  IT/TT single phase set up;
 +
 +
=== SIM card installation ===
 +
[[File:TeltoCharge Installation InstallationProcess SIMCardInstallation.PNG|border|frameless]]
 +
 +
Insert a nano SIM card into card slot.
 +
 +
=== Closing the middle panel ===
 +
[[File:TeltoCharge Installation InstallationProcess ClosingMiddlePanel.PNG|border|frameless|512x512px]]
 +
 +
'''A''' - Place a middle panel on the housing;
 +
 +
'''B''' - Fix it using DIN912 M3x8 screws;
 +
 +
=== Closing the front plate; ===
 +
[[File:TeltoCharge Installation InstallationProcess ClosingFrontPanel.PNG|border|frameless|473x473px]]
 +
 +
'''A''' - Insert the upper part of the front plate to the fixing holes and fix the plate;
 +
 +
'''B''' -  Fix it using DIN912 M3x8 screws;
 +
 +
'''C''' - Lock the top of the plate;
 +
 +
'''D''' - Lock the bottom of the plate;
 +
 +
'''E''' - Fix it using DIN912 M3x8 screws;

Revision as of 12:50, 17 February 2022

Main Page > TeltoCharge > Getting Started > Installation process

Installation process

Drilling

TeltoCharge Installation InstallationProcess DrillingA.pngA - Place the drilling template on the wall and mark the three fixing points.

TeltoCharge Installation InstallationProcess DrillingB.pngB - Drill holes where the fixing points are marked.

TeltoCharge Installation InstallationProcess DrillingC.pngC - Insert the wall plugs into the fixing holes.

Housing Installation

TeltoCharge Installation InstallationProcess HousingInstallation.png

1. Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).

2. Make sure the cable grommet is properly mounted on the cables (AC input cable and Ethernet cable).

Electrical wiring

518x518px

A - T/N single phase set up;

B - T/N Three phase set up;

C - IT/TT three phase set up;

D - IT/TT single phase set up;

SIM card installation

TeltoCharge Installation InstallationProcess SIMCardInstallation.PNG

Insert a nano SIM card into card slot.

Closing the middle panel

TeltoCharge Installation InstallationProcess ClosingMiddlePanel.PNG

A - Place a middle panel on the housing;

B - Fix it using DIN912 M3x8 screws;

Closing the front plate;

TeltoCharge Installation InstallationProcess ClosingFrontPanel.PNG

A - Insert the upper part of the front plate to the fixing holes and fix the plate;

B - Fix it using DIN912 M3x8 screws;

C - Lock the top of the plate;

D - Lock the bottom of the plate;

E - Fix it using DIN912 M3x8 screws;