Jump to content

Installation process: Difference between revisions

From Teltonika Energy Wiki
No edit summary
No edit summary
Line 13: Line 13:
2.  Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).
2.  Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).


← [https://wiki.teltonika-energy.com/index.php?title=Physical_installation&action=edit&redlink=1 BACK TO PHYSICAL INSTALLATION PAGE]


[[Category: Physical installation process]]
[[Category: Physical installation process]]

Revision as of 02:52, 31 March 2023

Main Page > TeltoCharge > Getting Started > Installation process

Installation process

Housing Installation

A - Place the drilling template on the wall and mark the three fixing points.

B - Drill holes where the fixing points are marked.

C - Insert the wall plugs into the fixing holes.

1. Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).

2. Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).