Difference between revisions of "Installation process (NA)"

From Wiki
m
m
Line 94: Line 94:
  
 
== Product code structure ==
 
== Product code structure ==
 +
[[File:Marking draft US .png|none|thumb|312x312px]]
 
{| class="wikitable" style="text-align: left;"
 
{| class="wikitable" style="text-align: left;"
 
|Model||Version||Power||Connector||Connectivity || Front plate color
 
|Model||Version||Power||Connector||Connectivity || Front plate color
Line 121: Line 122:
  
 
== Required tools ==
 
== Required tools ==
[[File:TeltoCharge Installation RequiredTools RequiredTools.PNG|center|frameless|551x551px]]
+
[[File:TeltoCharge Installation RequiredTools RequiredTools.PNG|frameless|551x551px]]
  
 
== Included Mounting parts ==
 
== Included Mounting parts ==
[[File:TeltoCharge Installation IncludedMountingParts IncludedMountingParts.PNG|center|frameless|538x538px]]
+
[[File:TeltoCharge Installation IncludedMountingParts IncludedMountingParts.PNG|frameless|538x538px]]
  
== EV Charger main elements ==
+
== EV Charger Main elements ==
[[File:TeltoCharge Installation MainElements US.png|center|frameless]]
+
 
 +
 
 +
[[File:TeltoCharge Installation MainElements US.png|frameless]]
  
 
==Site preparation requirements ==
 
==Site preparation requirements ==
Line 147: Line 150:
 
2.  Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).
 
2.  Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).
 
===Electrical wiring===
 
===Electrical wiring===
[[File:TeltoCharge_Installation_InstallationProcess_ElectricalWiring.png|border|frameless|518x518px]]
+
[[File:TeltoCharge_Installation_InstallationProcess_ElectricalWiring.png|border|frameless|342x342px]]
  
 
'''A''' - T/N single phase set up.
 
'''A''' - T/N single phase set up.
  
 
'''B''' - T/N Three phase set up.
 
'''B''' - T/N Three phase set up.
 
Insert a nano SIM card into card slot.
 
  
 
===Closing the middle panel===
 
===Closing the middle panel===
[[File:TeltoCharge Installation InstallationProcess ClosingMiddlePanel.PNG|border|frameless|512x512px]]
+
[[File:TeltoCharge Installation ClosingMiddlePanel US.png|frameless|235x235px]]
  
 
'''A''' - Place a middle panel on the housing and press it, till it clicks.
 
'''A''' - Place a middle panel on the housing and press it, till it clicks.
Line 163: Line 164:
  
 
===Closing the front plate;===
 
===Closing the front plate;===
[[File:TeltoCharge Installation InstallationProcess ClosingFrontPanel.PNG|border|frameless|473x473px]]
+
[[File:TeltoCharge Installation ClosingFrontPanel US.png|frameless|300x300px]]
 
 
'''Untethered version'''
 
 
 
'''A''' - Open up bottom part and insert the upper part of the front plate to the fixing holes and fix the plate;
 
 
 
'''B''' -  Fix it using DIN912 M3x8 screws;
 
 
 
'''Tethered version'''
 
  
 
'''C''' - Lock the top of the plate;
 
'''C''' - Lock the top of the plate;

Revision as of 08:34, 19 August 2022

General specifications

Teltocharge tethered with Type 1 cable

Picture of Tethered version charger
Dimensions without cable 170x341x97 mm
Weight without cable 2.8 kg
Operating temperature -30°C - +50°C
IP rating IP55
IK rating IK10
Certification UL2594
In compliance with IEC 61851-1

Electrical specifications

Here you can find information about electric parameters of Teltocharge product

AC INPUT SPECIFICATIONS
Maximum power 7,6 kW 9,6 kW 11,5 kW
Input AC power connection 2 phases
Maximum current 32 A 40 A 48 A
Input voltage 2 phases: (L-L) 240 ± 10% VAC
Rated frequency 50 / 60 HZ
Standby power consumption 4 W
Earth (ground) fault protection 20 mA AC, 6 mA DC
Overvoltage category OVC II
Protection against electric shock Class I
AC Output specifications
AC output voltage range 1 phase: (L-N) 240 ± 10% VAC
Connection Standart Type 1 cable
Connection to the grid NEMA 6-50 plug to the wall socket Direct cable from house grid

(Hardwired)

Power Cable
Maximum cable diameter 17.5 mm 20,75 mm
Maximum wire cross section 7.5 mm2

Product code structure

Marking draft US .png
Model Version Power Connector Connectivity Front plate color Front plate finish
A B C D E F G
EVC 1 - V1 3 - US 7,6 kW, 1/2P, 32A, 120/240V

4 - US 9,6 kW, 1/2P, 40A, 120/240V

5 - US 11.5kW, 1/2P, 48A, 120/240V

1 - Tethered cable 0 - Without GSM modem P - Gray

R - Red

M - Blue

B - White

0 - N/A

0 –  Without front panel

1 – Tethered cable

Required tools

TeltoCharge Installation RequiredTools RequiredTools.PNG

Included Mounting parts

TeltoCharge Installation IncludedMountingParts IncludedMountingParts.PNG

EV Charger Main elements

TeltoCharge Installation MainElements US.png

Site preparation requirements

  • Find a suitable site on a wall (The mounting surface required to be flat and stable, for example a finished, brick or concrete wall. Wall required to be suitable to withstand TeltoCharge weight with charging cable)​.
  • Make sure that the required power supply is easily accessible. (Required power supply depends on the type of charger).
  • Recommendation is not to install TeltoCharge on direct sunlight to avoid overheating.

Installation process

Housing Installation

TeltoCharge Installation InstallationProcess DrillingA.pngA - Place the drilling template on the wall and mark the three fixing points.

TeltoCharge Installation InstallationProcess DrillingB.pngB - Drill holes where the fixing points are marked.

TeltoCharge Installation InstallationProcess DrillingC.pngC - Insert the wall plugs into the fixing holes.

TeltoCharge Installation InstallationProcess HousingInstallation.png

1. Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).

2. Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).

Electrical wiring

TeltoCharge Installation InstallationProcess ElectricalWiring.png

A - T/N single phase set up.

B - T/N Three phase set up.

Closing the middle panel

TeltoCharge Installation ClosingMiddlePanel US.png

A - Place a middle panel on the housing and press it, till it clicks.

B - Fix it using DIN912 M3x8 screws;

Closing the front plate;

TeltoCharge Installation ClosingFrontPanel US.png

C - Lock the top of the plate;

D - Lock the bottom of the plate;

E - Fix it using DIN912 M3x8 screws;

LED indicatros

Information about LED indicators can be obtained from here