Powerverse Full Installation Guide (UK): Difference between revisions

From Teltonika Energy Wiki
Line 13: Line 13:
D - Close the front plate and fix it with M3x8 screws.
D - Close the front plate and fix it with M3x8 screws.


== Dynamic Load Balancing (DLB) ==
Dynamic Load Balancing (DLB) is achieved by monitoring the total electrical consumption of the building through a dedicated smart energy meter or CT clamps installed in the main electrical cabinet. Based on the real-time measurements provided by this meter, the charger automatically adjusts its charging power to ensure that the total household load does not exceed the available electrical capacity.
This functionality protects the building’s electrical installation from overload during peak usage periods and optimizes energy consumption according to the user's habits. The smart energy meter or CT clamps must always be installed at the main power source in the electrical distribution cabinet, where they can measure the total incoming current of the installation.
[[File:MicrosoftTeams-image (33).png|alt=|frameless|left|[[File:Ct-meter.png|thumb]]]]
[[File:Ct-direction.jpeg|frameless|371x371px|alt=|right]] [[File:Ct-meter.png|frameless|331x331px|alt=|center]]
'''Note :''' The CT cable included in the box is 3 meters long.
* Users can extend it to their desired length, depending on installation conditions such as electrical noise and resistance.
* Recommended extension length is up to 100 meters.
Principal scheme of connection:
[[File:DLB with CT.png|alt=|frameless|395x395px|center|[[File:DLB with CT.png|thumb]]]]
<br>
==PEN CT WIRING==
==PEN CT WIRING==



Revision as of 12:07, 13 March 2026

Physical Device Installation Guide

INSTALLATION MANUAL

Press on the picture:

thumb








MAIN STEPS

A - Fix the device on the wall by inserting the self-tapping screws (start with the top screw and make sure the housing is horizontal).
B - Make sure the cable gland is properly mounted on the cables (AC input cable and Ethernet cable).
C - Close middle panel by placing it on the housing (the panel must click to the housing). And fix it using M3x8 screws.
D - Close the front plate and fix it with M3x8 screws.

Dynamic Load Balancing (DLB)

Dynamic Load Balancing (DLB) is achieved by monitoring the total electrical consumption of the building through a dedicated smart energy meter or CT clamps installed in the main electrical cabinet. Based on the real-time measurements provided by this meter, the charger automatically adjusts its charging power to ensure that the total household load does not exceed the available electrical capacity.

This functionality protects the building’s electrical installation from overload during peak usage periods and optimizes energy consumption according to the user's habits. The smart energy meter or CT clamps must always be installed at the main power source in the electrical distribution cabinet, where they can measure the total incoming current of the installation.


Note : The CT cable included in the box is 3 meters long.

  • Users can extend it to their desired length, depending on installation conditions such as electrical noise and resistance.
  • Recommended extension length is up to 100 meters.

Principal scheme of connection:


PEN CT WIRING


Product has integrated PEN fault protection.

In order to receive this functionality it is required to pass the PE cable through the internal current transformer. CT shall be wired in terminal marked "PEN".

Device Commissioning Guide

First Start Guide

Follow these detailed steps to get started with TeltoCharge in a correct way:

Step Number Description Suggestions Links
1 Download EV Charging APP For Android
For Apple
2 Pair Pairing code is the last six digits of your installer code which can be found on the sticker. Pairing process
3 Update device to the latest FW After pairing, choose your device in the menu, and a notification may suggest updating the firmware version. How to update
4 Configure your TeltoCharge Follow steps in device configuration guide and using Teltonika EV Charging app set parameters according to your site requirements. Possible settings
5 Connect to Wifi After ensuring the device is configured according to your site requirements, open "Connectivity" window in the app and connect device to the internet via Wi-Fi or LAN. Connect to Wifi or LAN
6 Enable OCPP Once the device is connected to the internet, go to the "OCPP" tab in "Connectivity" window and connect the charger to the Powerverse App by entering this URL: wss://ocpp.powerverse.com:443/
note: Make sure your phone doesn't auto correct wss.
Connect to OCPP
Additional LED indicators Meaning of TeltoCharge LED indicators. LED indicators