Jump to content

Functionalities EVC2: Difference between revisions

From Teltonika Energy Wiki
 
(3 intermediate revisions by the same user not shown)
Line 7: Line 7:
='''NEW:''' Physical power selector switch=
='''NEW:''' Physical power selector switch=
* This switch is found on the interface board.   
* This switch is found on the interface board.   
* It could be turned to limit MAX device output. By changing rotary switch position it is possible to charge charger’s max output.
* It could be turned to limit MAX device output. By changing rotary switch position it is possible to change charger’s max output.
* By default (position 0) charger sets max possible output power depending on HW.  
* By default (position 0) charger sets max possible output power depending on HW.  
* Possible values differ between different modification devices.[[File:Power selector switch.png|thumb|none]]
* Possible values differ between different modification devices.[[File:Power selector switch.png|thumb|none]]
Line 53: Line 53:
* Meter port will be used for load balance and MID meter.  
* Meter port will be used for load balance and MID meter.  
* DLM port used only for load management.  
* DLM port used only for load management.  
* Dynamic Load Managment with MID meter for all of the secondary devices is '''possible'''  
* Dynamic Load Management with MID meter for all of the secondary devices is '''possible'''  
*  
*  
[[File:2x RS.png|frameless]]
[[File:2x RS.png|frameless]]
Line 93: Line 93:
For example: you set 32 A in Installer menu option '''Max power from grid''', so in user menu option '''Load balancing''' you will be able to set limitation from 6 A to 32 A.
For example: you set 32 A in Installer menu option '''Max power from grid''', so in user menu option '''Load balancing''' you will be able to set limitation from 6 A to 32 A.


''By default load balancing is set to 10 A, user can increase this value when he increases Max power from grid option in Installer menu.''
''By default load balancing is set to 10 A, user can increase this value when they increase Max power from grid option in Installer menu.''


= Schedule =
= Schedule =
Line 169: Line 169:


*''PIN code''
*''PIN code''
*''APN adress''
*''APN address''
*''Username''
*''Username''
*''Password''
*''Password''
Line 248: Line 248:


==Three phase charging==
==Three phase charging==
With this slider installer have an ability to turn off 3-phase charging (only if 3 phases are connected to the product).
With this slider installer have an ability to turn on 3-phase charging (only if 3 phases are connected to the product).




Line 278: Line 278:


==Temperature warning==
==Temperature warning==
There is a possibility to increase temperature warning level. When charger reaches this temperature level, it starts to ventilate itself by decreasing charging power. If Charger reaches 80''°C''  it turns off relays and stops charging process.
There is a possibility to increase temperature warning level. When charger reaches this temperature level, it starts to ventilate itself by decreasing charging power. If Charger reaches 8''5°C''  it turns off relays and stops charging process.





Latest revision as of 11:11, 20 October 2026

Main Page > TeltoCharge > Product guides > Functionalities EVC2