Dynamic load management (DLM) is a versatile solution applicable in various scenarios, providing users with the flexibility to choose between using it with or without ct clamps. Here are the key distinctions:
Dynamic load management (DLM) is a versatile solution applicable in various scenarios, providing users with the flexibility to choose between using it with or without ct clamps. Here are the key distinctions:


=== DLM with Ct Clamps: ===
=== DLM with CT Clamps: ===
This configuration is advantageous in the UK, where the use of CT clamps is beneficial for managing the electric load between chargers and other electronic devices. CT clamps enable precise control and optimization of the overall load, contributing to compliance with UK regulations. Their integration into DLM systems assists in efficient energy distribution, which is important for adhering to the energy standards and operational requirements suggested by UK energy authorities.
This configuration is advantageous in the UK, where the use of CT clamps is beneficial for managing the electric load between chargers and other electronic devices. CT clamps enable precise control and optimization of the overall load, contributing to compliance with UK regulations. Their integration into DLM systems assists in efficient energy distribution, which is important for adhering to the energy standards and operational requirements suggested by UK energy authorities.
[[File:Ct clamps.jpg|center|frameless|735x735px]]
[[File:Ct clamps.jpg|center|frameless|735x735px]]
Line 14: Line 14:


[[File:MicrosoftTeams-image (33).png|alt=|frameless|left|[[File:Ct-meter.png|thumb]]]]
[[File:MicrosoftTeams-image (33).png|alt=|frameless|left|[[File:Ct-meter.png|thumb]]]]
[[File:Ct-meter.png|center|frameless|331x331px]]
[[File:Ct-direction.jpeg|frameless|371x371px|alt=|right]] [[File:Ct-meter.png|frameless|331x331px|alt=|center]]
'''Note :''' The CT cable included in the box is 3 meters long.
* Users can extend it to their desired length, depending on installation conditions such as electrical noise and resistance.
* Recommended extension length is up to 100 meters.


=== DLM with smart meter: ===
===DLM with smart meter:===
This configuration enables users to efficiently manage the electric load between chargers and other electronic devices. By leveraging the capabilities of a smart meter, precise control and optimization of the overall load can be achieved.
This configuration enables users to efficiently manage the electric load between chargers and other electronic devices. By leveraging the capabilities of a smart meter, precise control and optimization of the overall load can be achieved.


Line 22: Line 25:




 
===DLM without external measuring system:===
=== DLM without external measuring system: ===
In cases where the focus is solely on managing the electricity load between chargers and there are no additional electronic devices contributing to the load, this option can be utilized. It offers a simplified approach to load management, tailored specifically to charger interactions.
In cases where the focus is solely on managing the electricity load between chargers and there are no additional electronic devices contributing to the load, this option can be utilized. It offers a simplified approach to load management, tailored specifically to charger interactions.


Line 29: Line 31:
[[File:DLM without meter.png|center|frameless|776x776px]]
[[File:DLM without meter.png|center|frameless|776x776px]]


== Teltonika Energy App Settings ==
==Teltonika Energy App Settings==
Once the chargers are properly connected to the electrical grid and interconnected to each other, the next step is to configure the settings for each charger using the Teltonika Energy app. Below, you will find a comprehensive list of the settings that should be adjusted to achieve DLM functionality.
===General meter settings===
If you want to enable dynamic load management with a smart meter, it is important to correctly configure the general meter settings. To ensure everything works correctly, please apply the following setup :
 
* Open user menu
* Open "'''''Installer Menu'''''"
* Open "'''''Load Balancing'''''" menu and select Modbus RTU meter.
* Enable "'''''Load Balancing'''''"
* If smart meter is connected with RS485 wires, press "'''''Search For Device'''''"
* *'''ONLY If TeltoCharge is unable''' to identify energy meter - use "'''''Manual Setup'''''"
 
[[File:Loadbalancing evc16 meter.png|frameless|764x764px]]
 
=== General CT settings===
 
If you want to enable dynamic load management with a CT, follow the steps below
 
* Open user menu
* Open "'''''Installer Menu'''''"
* Open "'''''Load Balancing'''''" menu and select CT.
* Enable "'''''Load Balancing'''''"
* Calibrate the CT clamp, it must be connected to the port but not yet clamped around a wire [[File:Loadbalancing evc16 ct.png|frameless|594x594px]]
 
===Max power from grid===
It is very important to set ''max power from grid'' parameter correctly in the '''PRIMARY''' charger if you want to use DLM. This parameter shows how much current you have in the circuit you want to balance. That means you have to set all available amperes.
 
If for example in the Primary charger you will set lower current, DLM might not work correctly and the chargers might not even start the charging process.
 
For the secondary chargers, this parameter is not as critical. It is advisable to set it to a maximum of 16 A (for 11 kW chargers) or 32 A (for 7.4/22 kW chargers).
 
[[File:Max_Power.png|alt=Max Power DLM|frameless|458x458px]]
 
=== Primary Device Configuration ===
The first thing would be to select the '''primary''' device that would control the rest of the group communication protocol between the master-slave and master-meter.
 
It should only be enabled for one charger per group only, the primary charger will handle all the calculations, establish communication with the smart meter and control whole group (maximum group size is 20 devices).
 
[[File:DLM_primary.png|alt=DLM primary|frameless|856x856px]]
 
This setting enabled the charger as the primary charger and allows to change the settings that will affect the whole group:
 
1.'''"Primary device"''' – Confirms that this is the primary device that will control the group
 
2.'''"Type"'''
 
* '''Dynamic''' – using a smart meter to balance
* '''Static''' – balancing only from '''''Max power from grid''''' parameter
 
3.'''"Secondary device count"''' the number of secondary devices
 
4.'''"Secondary device ID"''' start ID from which chargers will be counted (If it‘s set „2“, the first secondary device must have address 2 and this address must be increased by 1 with each new secondary device
 
5.'''"Advanced settings" -''' (More info below)
 
6.'''"Check status"''' – possibility to check communication type with secondary devices


=== Max power from grid ===
=== Advanced settings ===
[[File:2023-07-03 07 42 32-Window.png|right|frameless|245x245px]]
Advanced settings are the settings that most of the time are left default. Only on special occasions, those settings must be changed.
It is very important to set this parameter correctly in the master charger if you want to use DLM. This parameter shows how much of current you have in the circuit you want to balance. That means you have to set as much as this current can have amperes. Usually it should be the same current as the breaker tripping current. If for example in the master charger you will set lower current, DLM might not work and charger might not even start charging process.


For the slave charger, this parameter is not as critical. It is advisable to set it to a maximum of 16 A (for 11 kW chargers) or 32 A (for 7.4/22 kW chargers).
1. '''"Phase connected"''' – detected automatically


2. '''"Phase sharing mode"''' – type of chargers in group


=== General meter settings ===
3. '''"Current sharing mode"''' – Current is distribution mode
If you want to enable dynamic load management with a smart meter, it is important to correctly configure the general meter settings.
[[File:2023-07-03 07 45 16-Window.png|right|frameless|264x264px]]


# '''Energy meter type''': You need to select the type of smart meter (1-phase/3-phase). Please note that you can use a 1-phase charger even if the meter is 3-phase.
* Equal - Energy will be distributed equally among all active chargers
# '''RS-485 baud rate''': This information can be found in the meter settings accessible through the meter display. If the client cannot locate it, it is recommended to refer to the smart meter manual.
* By Priority - Energy will be distributed based on priority. Chargers will be prioritized according to their '''charging state'''.
# '''RS-485 parity/stop bit''': Similarly, this information can also be found in the meter settings. If the client is unable to find it, it is advisable to check the smart meter manual.


These settings must be configured for all chargers in the circuit, regardless of whether they are slaves and have direct communication with the meter. These settings establish the communication protocol between the master-slave and master-meter.
4. '''"Communication timeout"''' – delay before warning


=== General CT settings ===
5. '''"Communication settings"''' – settings must be the '''same for all the devices in the group'''
[[File:Calibrate-ct.jpg|right|frameless|266x266px]]
1- By default, it is set to 3 seconds. However, there may be cases where the user needs to increase this value. For instance, if there are significant distances between the chargers and the ct clamps or if there are numerous interconnected chargers.
# '''Measuring device''': The meter should be selected. For UK chargers, it is possible to choose CT clamps
# '''Energy meter address''': This information can be found in the meter settings accessed through the meter display.
Note: Before calibration, CT have to be connected to the port, but not clamped around the cable.


=== How to calibrate CT: ===
* RS-485 baud rate
* RS-485 parity
* RS-485 stop bit


1- Before calibration, CT have to be connected to the port, but not clamped around the cable.
[[File:Advanced_Primary.png|alt=Advanced Primary|frameless|456x456px]]


2- Check DLB CT and press Calibrate.
=== Secondary device configuration ===
[[File:App-ct-configuration.jpg|right|frameless|245x245px]]
After Primary device configuration, it’s '''mandatory''' to enable '''Dynamic load management''' mode and correctly set-up '''each secondary device'''. (This action must be repeated for each new secondary device)
3 - Success.


=== Dynamic Load Balancing ===
For each secondary device few settings must be adjusted:
[[File:2023-07-03 07 51 37-Window.png|right|frameless|257x257px]]
To access the DLM functionality, the user must first enable the DLB functionality


# '''Measuring device''': The meter should be selected. For UK chargers, it is possible to choose CT clamps.
* '''Max power from grid''' - It is advisable to set it to a maximum of 16 A (for 11 kW chargers) or 32 A (for 7.4/22 kW chargers)
# '''Energy meter address''': This information can be found in the meter settings accessed through the meter display. If the address cannot be located, it is recommended to consult the smart meter manual.
# '''Current update interval''': By default, it is set to 3 seconds. However, there may be cases where the user needs to increase this value. For instance, if there are significant distances between the chargers and the smart meter or if there are numerous interconnected chargers.


=== Dynamic Load Management ===
* '''Secondary device''' – enabled
When setting up all the previous configurations, it is time to proceed with the main DLM settings. To enable these settings, the user must first activate DLM.
* '''Secondary device ID''' – for the first device it must be as set in the master, for each new secondary device this must be increased by 1
[[File:2023-07-03 08 27 42-Window.png|right|frameless|397x397px]]
* '''Advanced settings''' –  must match with the primary device settings


# '''Master mode''': This setting designates the charger as the master charger. It should only be enabled for one charger, which will handle all the calculations and establish communication with the smart meter.
[[File:Secondary_config.png|frameless|854x854px]]
# '''Measure grid load''': This setting should be enabled if DLM functionality with a meter is desired. If there are no plans to use a smart meter, it is important to disable this setting to prevent meter errors due to lack of connection. Please note that this setting is exclusively available for the master charger.
# '''Phase sharing mode''' - This configuration determines the type of chargers being used in the circuit. If all chargers are connected to a single phase, select "1 Phase." If all chargers are connected to three phases, select "3 Phase." If there is a mix of one-phase and three-phase chargers, select "Mixed."
#* ''In unbalanced grid cases (severe differences of load on phases), "mixed" mode can be used to optimise the number of charging vehicles. In this case the current is firstly distributed for 3 phase capable EVSEs, and when there is a significant surplus of power on any phase, the other EVSEs will use 1 phase charging mode.''
# '''Current sharing mode''' - There are two distinct current sharing modes available:
#* Equal distribution: Energy will be distributed equally among all active chargers.
#* Distribution by priority: Energy will be distributed based on priority. Chargers will be prioritized according to their charging state, and those with higher priority will receive maximum charging power.
#** ''For example, if we have a 100 A grid and five connected chargers, each capable of accepting 30 A, the first three chargers will receive 30 A each. The fourth charger will receive only 10 A, and the fifth charger will not initiate the charging process at all. This setting is exclusive to the master charger.''
# '''Phase connection''' - The user needs to select this option for each charger in the circuit. This setting configures the charger type, whether it is a single-phase, two-phase, or three-phase charger. Configuring this accurately is crucial for more efficient load balancing. It is important to ensure that the phase numbering aligns with the meter's phase numbering; otherwise, DLM functionality may be affected.
# '''Slave Modbus address start''' - This setting is exclusive to the master charger. The user needs to specify the starting address for the slave chargers. For instance, if the start address is set to 1, the first slave charger should have address 1, the second should have address 2, the third should have address 3, and so on.
# Each slave charger has its own specific setting called "'''Slave Modbus address'''". This setting must be configured individually for each charger.
# '''Number of devices''' - This setting is available only for the master charger. The administrator must specify the total number of slave chargers that will be connected in the circuit.

Latest revision as of 16:02, 13 March 2026

Dynamic Load Management

Dynamic load management is a sophisticated feature that empowers users to efficiently control electric load by managing a group of chargers installed within a single circuit. Through the implementation of modbus RS-485 communication, the chargers are able to communicate with one another and dynamically adjust their charging power in response to the load on the grid, ensuring optimal charging operations and grid stability.

DLM Types

Dynamic load management (DLM) is a versatile solution applicable in various scenarios, providing users with the flexibility to choose between using it with or without ct clamps. Here are the key distinctions:

DLM with CT Clamps:

This configuration is advantageous in the UK, where the use of CT clamps is beneficial for managing the electric load between chargers and other electronic devices. CT clamps enable precise control and optimization of the overall load, contributing to compliance with UK regulations. Their integration into DLM systems assists in efficient energy distribution, which is important for adhering to the energy standards and operational requirements suggested by UK energy authorities.

CT Connection

Dynamic Load Management (DLM) is achieved through a carefully interconnected system of chargers, where communication is governed by a designated "Master" charger, dictating instructions to the remaining "Slave" chargers. These chargers can be interconnected either in a serial or parallel manner, each requiring the use of UTP twisted pair cables for communication via the A and B pins.


Note : The CT cable included in the box is 3 meters long.

  • Users can extend it to their desired length, depending on installation conditions such as electrical noise and resistance.
  • Recommended extension length is up to 100 meters.

DLM with smart meter:

This configuration enables users to efficiently manage the electric load between chargers and other electronic devices. By leveraging the capabilities of a smart meter, precise control and optimization of the overall load can be achieved.


DLM without external measuring system:

In cases where the focus is solely on managing the electricity load between chargers and there are no additional electronic devices contributing to the load, this option can be utilized. It offers a simplified approach to load management, tailored specifically to charger interactions.


Teltonika Energy App Settings

General meter settings

If you want to enable dynamic load management with a smart meter, it is important to correctly configure the general meter settings. To ensure everything works correctly, please apply the following setup :

  • Open user menu
  • Open "Installer Menu"
  • Open "Load Balancing" menu and select Modbus RTU meter.
  • Enable "Load Balancing"
  • If smart meter is connected with RS485 wires, press "Search For Device"
  • *ONLY If TeltoCharge is unable to identify energy meter - use "Manual Setup"

General CT settings

If you want to enable dynamic load management with a CT, follow the steps below

  • Open user menu
  • Open "Installer Menu"
  • Open "Load Balancing" menu and select CT.
  • Enable "Load Balancing"
  • Calibrate the CT clamp, it must be connected to the port but not yet clamped around a wire

Max power from grid

It is very important to set max power from grid parameter correctly in the PRIMARY charger if you want to use DLM. This parameter shows how much current you have in the circuit you want to balance. That means you have to set all available amperes.

If for example in the Primary charger you will set lower current, DLM might not work correctly and the chargers might not even start the charging process.

For the secondary chargers, this parameter is not as critical. It is advisable to set it to a maximum of 16 A (for 11 kW chargers) or 32 A (for 7.4/22 kW chargers).

Max Power DLM

Primary Device Configuration

The first thing would be to select the primary device that would control the rest of the group communication protocol between the master-slave and master-meter.

It should only be enabled for one charger per group only, the primary charger will handle all the calculations, establish communication with the smart meter and control whole group (maximum group size is 20 devices).

DLM primary

This setting enabled the charger as the primary charger and allows to change the settings that will affect the whole group:

1."Primary device" – Confirms that this is the primary device that will control the group

2."Type"

  • Dynamic – using a smart meter to balance
  • Static – balancing only from Max power from grid parameter

3."Secondary device count" the number of secondary devices

4."Secondary device ID" start ID from which chargers will be counted (If it‘s set „2“, the first secondary device must have address 2 and this address must be increased by 1 with each new secondary device

5."Advanced settings" - (More info below)

6."Check status" – possibility to check communication type with secondary devices

Advanced settings

Advanced settings are the settings that most of the time are left default. Only on special occasions, those settings must be changed.

1. "Phase connected" – detected automatically

2. "Phase sharing mode" – type of chargers in group

3. "Current sharing mode" – Current is distribution mode

  • Equal - Energy will be distributed equally among all active chargers
  • By Priority - Energy will be distributed based on priority. Chargers will be prioritized according to their charging state.

4. "Communication timeout" – delay before warning

5. "Communication settings" – settings must be the same for all the devices in the group

  • RS-485 baud rate
  • RS-485 parity
  • RS-485 stop bit

Advanced Primary

Secondary device configuration

After Primary device configuration, it’s mandatory to enable Dynamic load management mode and correctly set-up each secondary device. (This action must be repeated for each new secondary device)

For each secondary device few settings must be adjusted:

  • Max power from grid - It is advisable to set it to a maximum of 16 A (for 11 kW chargers) or 32 A (for 7.4/22 kW chargers)
  • Secondary device – enabled
  • Secondary device ID – for the first device it must be as set in the master, for each new secondary device this must be increased by 1
  • Advanced settings –  must match with the primary device settings