= DYNAMIC LOAD MANAGEMENT = | = DYNAMIC LOAD MANAGEMENT = | ||
Dynamic load management (DLM) is a sophisticated feature that empowers users to efficiently control electric load by managing a group of chargers installed within a single circuit. Through the implementation of Modbus RS-485 communication, the chargers are able to communicate with one another and dynamically adjust their charging power in response to the load on the grid, ensuring optimal charging operations and grid stability. | Dynamic load management (DLM) is a sophisticated feature that empowers users to efficiently control electric load by managing a group of chargers installed within a single circuit. Through the implementation of Modbus RS-485 or TCP/IP communication, the chargers are able to communicate with one another and dynamically adjust their charging power in response to the load on the grid, ensuring optimal charging operations and grid stability. | ||
== DLM VIA MODBUS RTU == | == DLM VIA MODBUS RTU == | ||
=== DLM with smart meter === | === DLM with smart meter === | ||
This configuration enables users to efficiently manage the electric load between chargers and other electronic devices. By leveraging the capabilities of a smart meter, precise control and optimization of the overall load can be achieved. | This configuration enables users to efficiently manage the electric load between chargers and other electronic devices. By leveraging the capabilities of a smart meter, precise control and optimization of the overall load can be achieved. | ||
Example using Modbus RTU meter: | |||
[[File:DLM with meter.png|frameless|824x824px]] | [[File:DLM with meter.png|frameless|824x824px]] | ||
''[[Supported smart energy meters for Dynamic load balancing and Solar integration|--> Supported energy meters]]'' | ''[[Supported smart energy meters for Dynamic load balancing and Solar integration|--> Supported energy meters]]'' | ||
| Line 17: | Line 21: | ||
'''Serial connection:''' | '''Serial connection:''' | ||
[[File:EVC2 board DLM connection modified.png|frameless| | [[File:EVC2 board DLM connection modified v3.png|frameless|1003x1003px]] | ||
== DLM VIA MODBUS TCP/IP == | == DLM VIA MODBUS TCP/IP == | ||
'' | === DLM over WiFi or Ethernet === | ||
In cases where the installation has Ethernet or WiFi access - Load management is also available as long as chargers are on the same network. | |||
{| class="wikitable" | |||
|+ | |||
|[[File:DLM TCP IP ethernet without meter v2.png|frameless|561x561px]] | |||
|[[File:DLM TCP IP wifi without meter v2.png|frameless|561x561px]] | |||
|} | |||
[[File:DLM smart meter asset.png|left|278x278px]] | |||
Just like the Modbus RTU version - the primary device can have a smart meter / CT clamp connected to it for dynamic energy calculations. | |||
Both Modbus RTU and network meters (TCP/IP) are allowed in this setup. | |||
''[https://wiki.teltonika-energy.com/view/Dynamic_Load_Balancing_EVC2#SUPPORTED_ENERGY_METERS --> Supported energy meters]'' | |||
''[[Dynamic Load Balancing EVC2#MODBUS RTU METERS|--> Modbus RTU setup]]'' | |||
''[[Dynamic Load Balancing EVC2#MODBUS TCP/IP METERS|--> Modbus TCP/IP setup]]'' | |||
''[[Dynamic Load Balancing EVC2#CT CLAMPS|--> CT clamp setup]]'' | |||
== TELTONIKA ENERGY APP SETTINGS == | == TELTONIKA ENERGY APP SETTINGS == | ||
| Line 31: | Line 57: | ||
It is very important to set ''max power from grid'' parameter correctly in the '''PRIMARY''' charger if you want to use DLM. This parameter shows how much current you have in the circuit you want to balance. That means you have to set all available amperes. | It is very important to set ''max power from grid'' parameter correctly in the '''PRIMARY''' charger if you want to use DLM. This parameter shows how much current you have in the circuit you want to balance. That means you have to set all available amperes. | ||
If | If a lower current is set in the primary charger, DLM might not work correctly and the chargers might not even start the charging process. | ||
For the secondary chargers, this parameter is not as critical. It is advisable to set it to a maximum of 16 A (for 11 kW chargers) or 32 A (for 7.4/22 kW chargers). | For the secondary chargers, this parameter is not as critical. It is advisable to set it to a maximum of 16 A (for 11 kW chargers) or 32 A (for 7.4/22 kW chargers). | ||
| Line 38: | Line 64: | ||
=== Primary Device Configuration === | === Primary Device Configuration === | ||
The first thing would be to select the '''primary''' device that would control the rest of the group communication protocol between the | The first thing would be to select the '''primary''' device that would control the rest of the group communication protocol between the primary-secondary and primary-meter. | ||
It should only be enabled for one charger per group only, the primary charger will handle all the calculations, establish communication with the smart meter and control whole group (maximum group size is | It should only be enabled for one charger per group only, the primary charger will handle all the calculations, establish communication with the smart meter and control the whole group (maximum group size is 21 devices). | ||
[[File:DLM_primary.png|alt=DLM primary|frameless|595x595px]] | [[File:DLM_primary.png|alt=DLM primary|frameless|595x595px]] | ||
This setting | This setting enables the charger as the primary charger and allows to change the settings that will affect the whole group: | ||
1.'''"Primary device"''' – Confirms that this is the primary device that will control the group | 1.'''"Primary device"''' – Confirms that this is the primary device that will control the group | ||
| Line 62: | Line 88: | ||
=== Advanced settings === | === Advanced settings === | ||
Most of the time, these settings will be left at their default values. Advanced settings are only adjusted on special occasions. | |||
1. '''"Phase connected"''' – detected automatically | 1. '''"Phase connected"''' – detected automatically | ||