Functionalities EVC2: Difference between revisions
Appearance
No edit summary Tags: Reverted Visual edit: Switched |
|||
| (One intermediate revision by one other user not shown) | |||
| Line 125: | Line 125: | ||
If the EV charging process is interrupted (e. g. temporary power outage), the randomized delay will still be in effect when the power is restored, further delaying the start of charging.<br> | If the EV charging process is interrupted (e. g. temporary power outage), the randomized delay will still be in effect when the power is restored, further delaying the start of charging.<br> | ||
The maximum value for Randomized Delay can be set to up to 30 minutes if needed. | |||
= Errors and warnings = | = Errors and warnings = | ||
| Line 227: | Line 227: | ||
'' By default this setting is set to 10 Amps'' | '' By default this setting is set to 10 Amps'' | ||
= Supply voltage = | == Supply voltage == | ||
*Installer can change supply voltage (''voltage between phase and neutral wires'') | *Installer can change supply voltage (''voltage between phase and neutral wires'') | ||
*Different regions can have different supply voltages, so installer can set this value accordingly to the used voltage in the individual site; | *Different regions can have different supply voltages, so installer can set this value accordingly to the used voltage in the individual site; | ||