Difference between revisions of "Site preparation requirements"

From Wiki
(Created page with "==Site preparation requirements== * Find a suitable site on a wall (The mounting surface required to be flat and stable, for example a finished, brick or concrete wall. Wall r...")
 
m (Protected "Site preparation requirements" ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite)))
 

Latest revision as of 17:44, 7 February 2023

Site preparation requirements

  • Find a suitable site on a wall (The mounting surface required to be flat and stable, for example a finished, brick or concrete wall. Wall required to be suitable to withstand TeltoCharge weight with charging cable)​.
  • Make sure that the required power supply is easily accessible. (Required power supply depends on the type of charger).
  • Recommendation is not to install TeltoCharge on direct sunlight to avoid overheating.