Jump to content

Site preparation requirements: Difference between revisions

From Teltonika Energy Wiki
Created page with "==Site preparation requirements== * Find a suitable site on a wall (The mounting surface required to be flat and stable, for example a finished, brick or concrete wall. Wall r..."
 
m Protected "Site preparation requirements" ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite))
 
(No difference)

Latest revision as of 20:44, 7 February 2023

Site preparation requirements

  • Find a suitable site on a wall (The mounting surface required to be flat and stable, for example a finished, brick or concrete wall. Wall required to be suitable to withstand TeltoCharge weight with charging cable)​.
  • Make sure that the required power supply is easily accessible. (Required power supply depends on the type of charger).
  • Recommendation is not to install TeltoCharge on direct sunlight to avoid overheating.