For the slave charger, this parameter is not as critical. It is advisable to set it to a maximum of 16 A (for 11 kW chargers) or 32 A (for 7.4/22 kW chargers).
 
For the slave charger, this parameter is not as critical. It is advisable to set it to a maximum of 16 A (for 11 kW chargers) or 32 A (for 7.4/22 kW chargers).
 +
      Line 26: Line 27:     
=== General meter settings ===
 
=== General meter settings ===
[[File:2023-07-03 07 45 16-Window.png|right|frameless|273x273px]]
+
[[File:2023-07-03 07 45 16-Window.png|right|frameless|276x276px]]
 
If you want to enable dynamic load management with a smart meter, it is important to correctly configure the general meter settings.
 
If you want to enable dynamic load management with a smart meter, it is important to correctly configure the general meter settings.
   Line 34: Line 35:     
These settings must be configured for all chargers in the circuit, regardless of whether they are slaves and have direct communication with the meter. These settings establish the communication protocol between the master-slave and master-meter.
 
These settings must be configured for all chargers in the circuit, regardless of whether they are slaves and have direct communication with the meter. These settings establish the communication protocol between the master-slave and master-meter.
 +
    
=== Dynamic Load Balancing ===
 
=== Dynamic Load Balancing ===