Jump to content

Solar integration EVC2: Revision history

EVC2 Advanced Topics > Solar integration EVC2

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

5 August 2025

4 August 2025

24 July 2025

23 July 2025

22 July 2025

18 July 2025

17 July 2025

16 July 2025

  • curprev 12:2912:29, 16 July 2025 KarolisS talk contribs m 5,394 bytes 0 Protected "Solar integrationEVC2" ([Edit=Allow only administrators] (indefinite) [Move=Allow only administrators] (indefinite))
  • curprev 10:0710:07, 16 July 2025 KarolisS talk contribs 5,394 bytes +5,394 Created page with " __TOC__ == Physical installation == *To ensure proper solar integration functionality, it is essential to begin with the correct physical installation. This involves having a smart energy meter installed in the electric circuit that possesses the necessary communication functionality and is included in our energy meter list. The meter plays a crucial role in detecting negative current flow, indicating when energy consumption is lower than solar..."